Reliability

We invest in infrastructure, technology and manpower, and make long-term plans to renew aging assets, so that we can continue to provide our customers with efficient and reliable power supply.

Making the Right Connections
As part of an 18-man team, Van maintains and repairs extra high voltage power cables that connect the transmission network,a key component of Singapore's grid. The team is also on 24-hr standby in case of any transmission network emergency situation.
NDP 2019: Stand By for Singapore
The countdown to National Day Parade (NDP) has begun. Lee Yong Ta, Senior Engineer of Electricity Operations, heads SP Group’s NDP standby crew with his team of 28 and has been on Parade duty in groups of four at all rehearsals.
Protecting Our Underground Network
SP’s critical electricity cables and gas pipes – networks spanning 11,500km and over 28,000km respectively – are buried underground. At the same time, across Singapore, there are always ongoing works for various construction projects.
The Doctor Is In: Grid Health Checks Prevent Issues
Like any good physician, Senior Engineer Dr Lai Kai Xian looks at, listens to, and feels the pulse of 11,000 substations and close to 30,000km of cables that make up the electricity grid in Singapore.